EDL energy dashboard
Working designSample data
EDL dashboard

Can EDL meet electricity demand?

This view combines operator-confirmed hydropower project data with EDL demand, power plans, backup needs, grid limits and imports or exports. It also shows what is causing each supply limit.

National energy security needs both hydropower project data and EDL demand and grid data.
What this case means · Demand and available hydropower follow the main forecast.
Expected demand
Current
690 MW
EDL data highest demand at 19:00
Hydropower EDL can receive
Current
720 MW
82% of power the projects can make
Supply balance after backup need
Current
4.3%
Enough supply in this case
Dry-season energy need covered
Current
108%
hydropower promised for use in Laos
Power not available
Current
192 MW
planned outage + unexpected outage + reduced output

Can supply meet demand for the next 24 hours?

See expected demand, hydropower that can reach the grid and the extra backup power needed, hour by hour.

LAO TIME
900675450225000040812162024
Expected EDL demandHydropower that can reach the gridDemand plus required backup

How much hydropower can EDL actually use?

Installed power is not the same as power that can reach EDL through contracts and the grid.

Total installed hydro power1,120 MW
Power the projects can make now920 MW
Power available to EDL770 MW
Power the grid can carry720 MW
Power planned now668 MW

Energy supply through wet and dry seasons

Compare expected hydropower energy with the energy promised for use in Laos.

MAIN FORECAST
SepOctNovDecJanFebMarApr
Hydro energy availableEnergy needed in Laos
April is the first month that may have a dry-season supply risk. EDL should check whether maintenance happens at the same time, confirm available imports and ask operators for updated forecasts.

How the projects are performing

Compare each hydropower project with its own water height and safe operating range.

91%
Share of project power available

Compared with this project’s own design

96%
Generation plan met

Compared with this project’s own design

94%
Energy made from the available water

Compared with this project’s own design

Why electricity supply may fall short

Each problem shows whether the cause comes from the hydropower project, grid, water conditions or missing data.

ReasonPower / energy affectedWho owns the data?Status
Planned maintenance
Unit 4 should return on 23 Aug
−150 MWOperator dataWatching
Power line delivery limit
Temporary grid limit
−50 MWEDL dataActive
Very low inflow forecast
Very dry case for the next 90 days
−38 GWhOfficial dataForecast
Operator data not updated
1 of 5 pilot projects is late
62 MW is uncertainCalculatedFollow up

What EDL should do next

Turn the dashboard information into clear actions.

1Confirm available power for the next 24 hours.
Two operators changed their reports after the deadline.
2Address the evening supply risk.
Extra supply is still positive but small. Stay ready.
3Coordinate the water and energy plans.
Review the proposed early release before changing the generation plan.
See the related water case →

What EDL would help design and manage

EDL keeps control of its data and approves how the platform uses it.

1

Enough supply for demand

Definitions for demand, required backup and power that can reach the grid

2

Outage planning

Project calendar, power at risk and expected return dates

3

Wet- and dry-season supply

Energy promised for Laos, stored energy and wet/dry forecasts

4

Data rules

Who can see the data, approved calculations and allowed uses